Tracking issue for 13.0(n) parameter binding infrastructure. See plan-doc: docs/plans/extract-starlark-from-op/phase-8/13.0-n.md
Activity
docs(13.0(n)): draft plan-doc for parameter binding infrastructure
docs(13.0(n)): lock parameter binding infrastructure design
feat(13.0(n) Phase 1): Go-side foundations for Variable binding
feat(13.0(n) Phase 1): consolidate binding infra + session-owning App…
feat(13.0(n) Phase 1): RegisterParameter, session-owning Planner/Exec…
refactor(13.0(n) Phase 1): starlarkbridge.NewRuntime(env), devlore-te…
refactor(13.0(n) Phase 1): starlarkbridge.NewRuntime(env), devlore-te…
docs(13.0(n)): lock open-question decisions; pull plan.run into scope
feat(13.0(n) Phase 2): VariableResolver.Resolve cascade + envValue wr…
docs(13.0(n)): lock stack-frame execution model; rescope Phase 3
feat(13.0(n) Phase 3): Subgraph.Parameters() bubble-up + ownership po…
docs(13.0(n)): capture Phase 5 spec settlements; add Phase 3.5 precursor
feat(13.0(n)): close Phase 4 tests + parameter.go extraction; capture…
refactor(13.0(n) Phase 3.5): parent pointer -> ID; retryPolicy / erro…
refactor(13.0(n) Phase 3.5): parent pointer -> ID; retryPolicy / erro…
2 remaining items
refactor(13.0(n) Phase 4.5): strip executeSubgraph body pending Phase…
feat(13.0(n) Phase 4.5 B-class.2): implement Subgraph end-to-end via …
feat(13.0(n) Phase 4.5 B-class.3): Subgraph.Parameters() filters loca…
refactor(13.0(n) Phase 4.5 β-hybrid): Subgraph.children []ExecutableU…
docs(13.0(n)): switch orphan detection to parentID-as-reachability
refactor(13.0(n) Phase 4.6): β-strict wire form + free-func-to-method…
docs(13.0(n)): record Phase 4.6 in the plan
feat(13.0(n) Phase 5.2): Subgraph.SetErrorAction stamps parentID
refactor(13.0(n) Phase 5.3a): stampParent on ExecutableUnit interface
refactor(13.0(n) Phase 5.3b): errorAction is always *Subgraph
refactor(13.0(n) Phase 5.3b): errorAction is always *Subgraph
refactor(13.0(n) Phase 5): introduce op.Planner; land ActionPlanner +…
refactor(13.0(n) Phase 5): MethodMetadata + AnnounceProvider rewrite;…
David-Noble-at-work commentedon Aug 7, 2026
Closing as delivered: 13.0(n) is complete (docs/plans/extract-starlark-from-op/phase-8/13.0-n.md, status: complete).