The nightly flagship eval on main did not pass.

Start with the run's summary page: it names which lanes measured, which measured nothing, and
how long each took. Then download the failing lane's eval-<lane> artifact - it carries the
transcripts, judge rationales, backend log and Lemonade logs. Those machines are ephemeral and
already destroyed, so the artifact is the only copy, and it expires in 14 days.

A nightly failure with no PR behind it usually means the environment moved, not the code: a
Lemonade version bump, a re-quantised model, a driver or runner-image change. PR runs are
path-filtered and cannot see any of that, which is why this run exists.

cancelled rather than failure means no measurement happened at all - a manual cancel, or a
lane that waited out GitHub's 24h queue limit. Re-dispatch the workflow.

Activity

  1. github-actions commented on Oct 7, 2026

    @github-actions
    ContributorAuthor

    The nightly flagship eval on main did not pass.

    Start with the run's summary page: it names which lanes measured, which measured nothing, and
    how long each took. Then download the failing lane's eval-<lane> artifact - it carries the
    transcripts, judge rationales, backend log and Lemonade logs. Those machines are ephemeral and
    already destroyed, so the artifact is the only copy, and it expires in 14 days.

    A nightly failure with no PR behind it usually means the environment moved, not the code: a
    Lemonade version bump, a re-quantised model, a driver or runner-image change. PR runs are
    path-filtered and cannot see any of that, which is why this run exists.

    cancelled rather than failure means no measurement happened at all - a manual cancel, or a
    lane that waited out GitHub's 24h queue limit. Re-dispatch the workflow.

  2. github-actions commented on Oct 9, 2026

    @github-actions
    ContributorAuthor

    The nightly flagship eval on main did not pass.

    Start with the run's summary page: it names which lanes measured, which measured nothing, and
    how long each took. Then download the failing lane's eval-<lane> artifact - it carries the
    transcripts, judge rationales, backend log and Lemonade logs. Those machines are ephemeral and
    already destroyed, so the artifact is the only copy, and it expires in 14 days.

    A nightly failure with no PR behind it usually means the environment moved, not the code: a
    Lemonade version bump, a re-quantised model, a driver or runner-image change. PR runs are
    path-filtered and cannot see any of that, which is why this run exists.

    cancelled rather than failure means no measurement happened at all - a manual cancel, or a
    lane that waited out GitHub's 24h queue limit. Re-dispatch the workflow.

  3. github-actions commented on Oct 10, 2026

    @github-actions
    ContributorAuthor

    The nightly flagship eval on main did not pass.

    Start with the run's summary page: it names which lanes measured, which measured nothing, and
    how long each took. Then download the failing lane's eval-<lane> artifact - it carries the
    transcripts, judge rationales, backend log and Lemonade logs. Those machines are ephemeral and
    already destroyed, so the artifact is the only copy, and it expires in 14 days.

    A nightly failure with no PR behind it usually means the environment moved, not the code: a
    Lemonade version bump, a re-quantised model, a driver or runner-image change. PR runs are
    path-filtered and cannot see any of that, which is why this run exists.

    cancelled rather than failure means no measurement happened at all - a manual cancel, or a
    lane that waited out GitHub's 24h queue limit. Re-dispatch the workflow.

  4. github-actions commented on Oct 12, 2026

    @github-actions
    ContributorAuthor

    The nightly flagship eval on main did not pass.

    Start with the run's summary page: it names which lanes measured, which measured nothing, and
    how long each took. Then download the failing lane's eval-<lane> artifact - it carries the
    transcripts, judge rationales, backend log and Lemonade logs. Those machines are ephemeral and
    already destroyed, so the artifact is the only copy, and it expires in 14 days.

    A nightly failure with no PR behind it usually means the environment moved, not the code: a
    Lemonade version bump, a re-quantised model, a driver or runner-image change. PR runs are
    path-filtered and cannot see any of that, which is why this run exists.

    cancelled rather than failure means no measurement happened at all - a manual cancel, or a
    lane that waited out GitHub's 24h queue limit. Re-dispatch the workflow.

  5. github-actions commented on Oct 13, 2026

    @github-actions
    ContributorAuthor

    The nightly flagship eval on main did not pass.

    Start with the run's summary page: it names which lanes measured, which measured nothing, and
    how long each took. Then download the failing lane's eval-<lane> artifact - it carries the
    transcripts, judge rationales, backend log and Lemonade logs. Those machines are ephemeral and
    already destroyed, so the artifact is the only copy, and it expires in 14 days.

    A nightly failure with no PR behind it usually means the environment moved, not the code: a
    Lemonade version bump, a re-quantised model, a driver or runner-image change. PR runs are
    path-filtered and cannot see any of that, which is why this run exists.

    cancelled rather than failure means no measurement happened at all - a manual cancel, or a
    lane that waited out GitHub's 24h queue limit. Re-dispatch the workflow.

  6. github-actions commented on Oct 14, 2026

    @github-actions
    ContributorAuthor

    The nightly flagship eval on main did not pass.

    Start with the run's summary page: it names which lanes measured, which measured nothing, and
    how long each took. Then download the failing lane's eval-<lane> artifact - it carries the
    transcripts, judge rationales, backend log and Lemonade logs. Those machines are ephemeral and
    already destroyed, so the artifact is the only copy, and it expires in 14 days.

    A nightly failure with no PR behind it usually means the environment moved, not the code: a
    Lemonade version bump, a re-quantised model, a driver or runner-image change. PR runs are
    path-filtered and cannot see any of that, which is why this run exists.

    cancelled rather than failure means no measurement happened at all - a manual cancel, or a
    lane that waited out GitHub's 24h queue limit. Re-dispatch the workflow.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions