Skip to content

Move a second batch of mac/ios tests to prod. - #76732

Merged
godofredoc merged 1 commit into
flutter:masterfrom
godofredoc:second_batch
Feb 24, 2021
Merged

godofredoc merged 1 commit into
flutter:masterfrom
godofredoc:second_batch

Conversation

@godofredoc

Copy link
Copy Markdown
Contributor

Moving a second batch of tests that passing consistently to prod and removing them from the agents.

Bug: #73392

Pre-launch Checklist

  • I read the Contributor Guide and followed the process outlined there for submitting PRs.
  • I read the Tree Hygiene wiki page, which explains my responsibilities.
  • I read and followed the Flutter Style Guide, including Features we expect every widget to implement.
  • I signed the CLA.
  • I listed at least one issue that this PR fixes in the description above.
  • I updated/added relevant documentation (doc comments with ///).
  • I added new tests to check the change I am making or feature I am adding, or Hixie said the PR is test-exempt.
  • All existing and new tests are passing.

If you need help, consider asking for advice on the #hackers-new channel on Discord.

@flutter-dashboard flutter-dashboard Bot added the c: contributor-productivity Team-specific productivity, code health, technical debt. label Feb 24, 2021
@google-cla google-cla Bot added the cla: yes label Feb 24, 2021
@godofredoc
godofredoc merged commit f506aa9 into flutter:master Feb 24, 2021
@godofredoc
godofredoc deleted the second_batch branch February 24, 2021 23:40
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

c: contributor-productivity Team-specific productivity, code health, technical debt.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants